• Hyperreality@kbin.social
    link
    fedilink
    arrow-up
    7
    ·
    edit-2
    1 year ago

    Cold climate?

    How the fuck are you supposed to heat that thing? It’s designed like a heat sync, is all open plan and windows, and looks to be insulated with corrugated iron.

    Built in 1959, no surprise. Probably thought they’d be able to start phase 3 and go nuclear powered within the decade.

    But hey, on the plus side there’s a brook running through the foundations.